Defer adding files to the annex until commit time, when during a batch operation, a bundle of files will be available. This will allow for checking a them all with a single lsof call. The tricky part is that adding the file causes a symlink change inotify. So I made it wait for an appropriate number of symlink changes to be received before continuing with the commit. This avoids any delay in the commit process. It is possible that some unrelated symlink change is made; if that happens it'll commit it and delay committing the newly added symlink for 1 second. This seems ok. I do rely on the expected symlink change event always being received, but only when the add succeeds. Another way to do it might be to directly stage the symlink, and then ignore the redundant symlink change event. That would involve some redundant work, and perhaps an empty commit, but if this code turns out to have some bug, that'd be the best way to avoid it. FWIW, this change seems to, as a bonus, have produced better grouping of batch changes into single commits. Before, a large batch change would result in a series of commits, with the first containing only one file, and each of the rest bundling a number of files. Now, the added wait for the symlink changes to arrive gives time for additional add changes to be processed, all within the same commit.
155 lines
4.6 KiB
Haskell
155 lines
4.6 KiB
Haskell
{- git-annex assistant change tracking and committing
|
|
-
|
|
- Copyright 2012 Joey Hess <joey@kitenet.net>
|
|
-}
|
|
|
|
module Assistant.Committer where
|
|
|
|
import Common.Annex
|
|
import Assistant.ThreadedMonad
|
|
import qualified Annex.Queue
|
|
import qualified Git.Command
|
|
import qualified Command.Add
|
|
import Utility.ThreadScheduler
|
|
|
|
import Control.Concurrent.STM
|
|
import Data.Time.Clock
|
|
|
|
data ChangeType = PendingAddChange | LinkChange | RmChange | RmDirChange
|
|
deriving (Show, Eq)
|
|
|
|
type ChangeChan = TChan Change
|
|
|
|
data Change = Change
|
|
{ changeTime :: UTCTime
|
|
, changeFile :: FilePath
|
|
, changeType :: ChangeType
|
|
}
|
|
deriving (Show)
|
|
|
|
runChangeChan :: STM a -> IO a
|
|
runChangeChan = atomically
|
|
|
|
newChangeChan :: IO ChangeChan
|
|
newChangeChan = atomically newTChan
|
|
|
|
{- Handlers call this when they made a change that needs to get committed. -}
|
|
madeChange :: FilePath -> ChangeType -> Annex (Maybe Change)
|
|
madeChange f t = do
|
|
-- Just in case the commit thread is not flushing the queue fast enough.
|
|
when (t /= PendingAddChange) $
|
|
Annex.Queue.flushWhenFull
|
|
liftIO $ Just <$> (Change <$> getCurrentTime <*> pure f <*> pure t)
|
|
|
|
noChange :: Annex (Maybe Change)
|
|
noChange = return Nothing
|
|
|
|
{- Gets all unhandled changes.
|
|
- Blocks until at least one change is made. -}
|
|
getChanges :: ChangeChan -> IO [Change]
|
|
getChanges chan = runChangeChan $ do
|
|
c <- readTChan chan
|
|
go [c]
|
|
where
|
|
go l = do
|
|
v <- tryReadTChan chan
|
|
case v of
|
|
Nothing -> return l
|
|
Just c -> go (c:l)
|
|
|
|
{- Puts unhandled changes back into the channel.
|
|
- Note: Original order is not preserved. -}
|
|
refillChanges :: ChangeChan -> [Change] -> IO ()
|
|
refillChanges chan cs = runChangeChan $ mapM_ (writeTChan chan) cs
|
|
|
|
{- This thread makes git commits at appropriate times. -}
|
|
commitThread :: ThreadState -> ChangeChan -> IO ()
|
|
commitThread st changechan = runEvery (Seconds 1) $ do
|
|
-- We already waited one second as a simple rate limiter.
|
|
-- Next, wait until at least one change has been made.
|
|
cs <- getChanges changechan
|
|
-- Now see if now's a good time to commit.
|
|
time <- getCurrentTime
|
|
if shouldCommit time cs
|
|
then do
|
|
handleAdds st changechan cs
|
|
void $ tryIO $ runThreadState st commitStaged
|
|
else refillChanges changechan cs
|
|
|
|
{- If there are PendingAddChanges, the files have not yet actually been
|
|
- added to the annex, and that has to be done now, before committing.
|
|
-
|
|
- Deferring the adds to this point causes batches to be bundled together,
|
|
- which allows faster checking with lsof that the files are not still open
|
|
- for write by some other process.
|
|
-
|
|
- When a file is added, Inotify will notice the new symlink. So this waits
|
|
- for one new LinkChange to be received per file that's successfully
|
|
- added, to ensure that its symlink has been staged before returning.
|
|
-}
|
|
handleAdds :: ThreadState -> ChangeChan -> [Change] -> IO ()
|
|
handleAdds st changechan cs
|
|
| null added = noop
|
|
| otherwise = do
|
|
numadded <- length . filter id <$>
|
|
runThreadState st (forM added add)
|
|
waitforlinkchanges numadded
|
|
where
|
|
added = filter isPendingAdd cs
|
|
|
|
isPendingAdd (Change { changeType = PendingAddChange }) = True
|
|
isPendingAdd _ = False
|
|
isLinkChange (Change { changeType = LinkChange }) = True
|
|
isLinkChange _ = False
|
|
|
|
add (Change { changeFile = file }) = do
|
|
showStart "add" file
|
|
handle file =<< Command.Add.ingest file
|
|
|
|
handle _ Nothing = do
|
|
showEndFail
|
|
return False
|
|
handle file (Just key) = do
|
|
Command.Add.link file key True
|
|
showEndOk
|
|
return True
|
|
|
|
waitforlinkchanges 0 = noop
|
|
waitforlinkchanges n = do
|
|
c <- runChangeChan $ readTChan changechan
|
|
if (isLinkChange c)
|
|
then waitforlinkchanges (n-1)
|
|
else do
|
|
handleAdds st changechan [c]
|
|
waitforlinkchanges n
|
|
|
|
commitStaged :: Annex ()
|
|
commitStaged = do
|
|
Annex.Queue.flush
|
|
inRepo $ Git.Command.run "commit"
|
|
[ Param "--allow-empty-message"
|
|
, Param "-m", Param ""
|
|
-- Empty commits may be made if tree changes cancel
|
|
-- each other out, etc
|
|
, Param "--allow-empty"
|
|
-- Avoid running the usual git-annex pre-commit hook;
|
|
-- watch does the same symlink fixing, and we don't want
|
|
-- to deal with unlocked files in these commits.
|
|
, Param "--quiet"
|
|
]
|
|
|
|
{- Decide if now is a good time to make a commit.
|
|
- Note that the list of change times has an undefined order.
|
|
-
|
|
- Current strategy: If there have been 10 changes within the past second,
|
|
- a batch activity is taking place, so wait for later.
|
|
-}
|
|
shouldCommit :: UTCTime -> [Change] -> Bool
|
|
shouldCommit now changes
|
|
| len == 0 = False
|
|
| len > 10000 = True -- avoid bloating queue too much
|
|
| length (filter thisSecond changes) < 10 = True
|
|
| otherwise = False -- batch activity
|
|
where
|
|
len = length changes
|
|
thisSecond c = now `diffUTCTime` changeTime c <= 1
|